Archived operational intelligence briefing
TIME: 071330Z DEC 25 (D+0 / H+16.5 UPDATE) SUBJECT: POKROVSK URBAN CONTACT CONFIRMED // RF ACCELERATING EXPLOITATION AXES // ADVANCED DRONE THREAT ESCALATES
The operational gravity has shifted rapidly to the Donetsk/Pokrovsk axis. The predicted consolidation phase for the RF has been bypassed for immediate tactical exploitation.
Clear conditions persist, favoring RF Intelligence, Surveillance, and Reconnaissance (ISR) and precision strike capabilities, especially concerning the movement of high-speed air assets in the Northeast.
RF: RF forces are demonstrating synchronization by simultaneously pressing the Pokrovsk main axis and maintaining high-tempo air activity on the Northeast flank. This multi-domain exploitation aims to prevent UAF reserves from reaching the decisive battle area. UAF: CRITICAL STATUS. UAF forces at Pokrovsk are engaged in urban Counter-Infiltration Operations (CIO). This defensive action is premature for the overall operational timeline. The immediate focus must be on containing the Pokrovsk breach while ensuring the Lviv-Zviahel-Dnipro logistical spine remains viable against deep strike MDCOA. Regional logistics (Zaporizhzhia) are actively prioritizing EW and UAS delivery to stabilize the front (13:00Z).
RF Intent is to achieve a decisive breakthrough at Pokrovsk/Kurakhove before UAF can consolidate the new defensive phase line, leveraging the loss of combat power at Stepnohorsk and the logistical friction caused by the Fastiv strike.
The primary tactical adaptation is the accelerated commitment of maneuver elements to exploit the gap south of the Donetsk line, resulting in the premature engagement at Pokrovsk. This indicates a high level of operational risk acceptance by RF command.
RF continues to rely on strategic procurement (India drone deals, previous SITREP) and asymmetrical strikes (advanced Shaheds) to maintain operational tempo. The UAF must continue to assume the Fastiv rail hub is inoperable for high-volume transport.
RF C2 remains effective in coordinating multi-axis pressure (Donetsk ground assault + Northeast air/deep strike pressure). The use of internal, opaque military channels ("Fighterbomber" imagery) suggests continued high security for internal communications regarding operational plans.
POSTURE: UAF forces at Pokrovsk are currently reactive, engaged in CIO, rather than established in a layered defense. This demands an immediate shift to a highly aggressive defensive posture to isolate and annihilate the forward RF penetration elements. READINESS: Tactical readiness remains high, particularly regarding air defense crews (confirmed Shahed intercepts, 12:41Z) and regional administrative support (Zaporizhzhia resupply, 13:00Z).
CRITICAL CONSTRAINT: Lack of heavy armor/mechanized infantry to reinforce the Pokrovsk outer perimeter immediately. The successful CIO within the UBA must be followed by immediate sealing of the urban perimeter to prevent RF reinforcement or breakthrough. CRITICAL REQUIREMENT: Immediate allocation of specialized counter-UAS platforms optimized for the interception of high-speed, jet-propelled drones, particularly along the Northern and Central corridors (Chernihiv, Kyiv).
RF propaganda is synchronized:
UAF messaging reinforces the necessity of the fight, the eternity of the soldier (12:35Z), and community solidarity (Zaporizhzhia Admin). This centralized, resilience-focused IO campaign is essential to absorb the shock of the Stepnohorsk defeat and the new reality of fighting within Pokrovsk.
RF IO is actively targeting EU internal cohesion (Macron/China tariff threat, 12:54Z). The UAF must ensure these economic frictions do not distract from the primary goal of containing Russian aggression.
JUDGMENT: RF has initiated the operational exploitation phase earlier and more aggressively than estimated. The fight for Pokrovsk is now a reality.
(HIGH CONFIDENCE - Probability 85%) Pokrovsk Assault Amplification. RF rapidly reinforces the lead elements currently engaged in CIO at Pokrovsk using mobile mechanized units (likely elements of the 38th GMRB or VDV reserve from Stepnohorsk). The goal is to establish a secure lodgment within the Pokrovsk UBA NLT 071800Z, forcing UAF to commit reserves piecemeal to internal urban combat rather than perimeter defense.
(HIGH CONFIDENCE - Probability 70%) Central Defensive Line Bypass and Rail Interdiction. While UAF focuses on containing Pokrovsk, RF tactical aviation and deep strike units (using advanced Shaheds) execute a coordinated multi-axis strike against the Lviv-Zviahel-Dnipro logistics spine, potentially targeting the Zviahel junction NLT 072000Z. Simultaneously, RF mobile infantry bypasses the committed UAF defense at Pokrovsk, establishing control over key logistical nodes (T-05-15 highway) to the west.
| Decision Point | Event Trigger | Time Estimate | Status | | :--- | :--- | :--- | :--- | | D+0/H+17.5 (Pokrovsk Perimeter) | Confirmation of successful UAF annihilation/isolation of RF forces within the Pokrovsk UBA. | NLT 071430Z DEC | IMMEDIATE | | D+0/H+20.0 (RF Reinforcement ID) | Identification of specific RF unit/composition reinforcing the Pokrovsk breach (e.g., armor vs. infantry). | NLT 071600Z DEC | CRITICAL | | D+0/H+24.0 (Deep Strike Response) | Confirmed missile/UAS attack on the Zviahel-Dnipro logistical spine. | NLT 072000Z DEC | HIGH RISK |
| Priority | Gap Description | Collection Requirement (CR) | Confidence Assessment | | :--- | :--- | :--- | :--- | | PRIORITY 1 (POKROVSK COMPOSITION): | Identification of the specific RF units (size, type) engaged in the Pokrovsk UBA to determine if this is infiltration or the Main Effort. | IMMEDIATE IMINT/LNO: High-resolution drone/ISR over Pokrovsk to track vehicle types (light infantry vs. armor). UAF units to report P-W status/vehicle IDs immediately upon contact. | LOW (Critical) | | PRIORITY 2 (ADVANCED UAS): | Technical specifications, operational ceiling, and C2 frequencies of the jet-propelled Shahed variant reported over Chernihiv. | TECHINT/SIGINT: Dedicated collection on known RF launch corridors for high-frequency emissions associated with jet propulsion guidance systems. | LOW | | PRIORITY 3 (RF RESERVE COMMITMENT): | Location and readiness of RF reserves released from the Stepnohorsk AO, specifically their current vector (Pokrovsk vs. Kupyansk). | IMINT/ELINT: High-tempo ISR along all primary transit routes (M-18 equivalent) NLT 071600Z. | MEDIUM |
//END OF REPORT//